Dakota County Logo
File #: DC-4433    Version:
Type: Consent Action Status: Passed
File created: 3/24/2025 In control: Board of Commissioners
On agenda: 4/22/2025 Final action: 4/22/2025
Enactment date: 4/22/2025 Resolution #: 25-199
Title: Authorization To Award Bid And Execute Contract With Schumacher Excavating Inc. And Amend 2025 Adopted Budget For State-Funded Township Bridge Replacement Projects, Existing Bridge L3285 Located In Hampton and Douglas Townships, And Existing Bridge L3249 Located in Marshan Township, County Projects 97-144 And 97-164
Sponsors: Transportation
Attachments: 1. Location Map CP 97-144 & CP 97-164

DEPARTMENT: Transportation

FILE TYPE: Consent Action

 

TITLE

title

Authorization To Award Bid And Execute Contract With Schumacher Excavating Inc. And Amend 2025 Adopted Budget For State-Funded Township Bridge Replacement Projects, Existing Bridge L3285 Located In Hampton and Douglas Townships, And Existing Bridge L3249 Located in Marshan Township, County Projects 97-144 And 97-164

end

 

RESOLUTION

body

WHEREAS, to provide a safe and efficient transportation system, Dakota County is proceeding with the County Projects (CP) 97-144 and 97-164; and

 

WHEREAS, CP 97-144 construction includes the replacement of structurally deficient township bridge L3285 located on Inga Avenue in Hampton and Douglas Townships; and

 

WHEREAS, CP 97-164 construction includes the replacement of structurally deficient township bridge L3249 located on 205th Street East in Marshan Township; and

 

WHEREAS, Dakota County is the lead agency for CP 97-144 and CP 97-164, with construction scheduled to begin in summer 2025 following authorization of a budget amendment and execution of a construction contract; and

 

WHEREAS, the 2025 Capital Improvement Program Adopted Budget requires amendment for CP 97-144 and 97-164 to continue with the construction contract with Schumacher Excavating Inc.; and

 

WHEREAS, the 2025 CIP budget includes $200,000 for CP 97-144 construction; and

 

WHEREAS, a budget amendment of $359,176.05 is requested to cover engineering design, construction administration, and construction costs for CP 97-144; and

 

WHEREAS, sufficient funds exist in the State-funded town bridge account (SAAS Acc. 75 and 76), State grant (SAAS Acc. 379 by MnDOT grant agreement number 1057925), and Township cost-shares to cover the engineering design, construction administration, and construction costs for CP 97-144; and

 

WHEREAS, the 2025 CIP budget includes $200,000 for CP 97-164 construction; and

 

WHEREAS, a budget amendment of $138,710.30 is requested to cover engineering design, construction administration, and construction costs for CP 97-164; and

 

WHEREAS, sufficient funds exist in the State-funded town bridge account (SAAS Acc. 75), Minnesota Department of Natural Resources (DNR) grant (contract no. DCA22093), and Township cost-shares to cover engineering design, construction administration, and construction costs for CP 97-164; and

 

WHEREAS, by Resolution No. 24-125 (March 12, 2024), County staff executed an agreement with the DNR (DCA22093 to encumber 25% of construction costs) for CP 97-164; and

 

WHEREAS, MN State administrative rule 8820.1500 allows ninety-five percent (95%) of the Town Bridge Account funds be released as soon as possible after the District State Aid Engineer (DSAE) receives initial State Aid pay request; and

 

WHEREAS, State grant (SAAS Acc. 379 by MnDOT grant agreement number 1057925) is reimbursable at the time of pay request by the contractor; and

 

WHEREAS, no County funds are allocated to CP 97-144 and CP 97-164.

 

NOW, THEREFORE, BE IT RESOLVED, That the Dakota County Board of Commissioners hereby authorizes its Transportation Director to execute a contract with Schumacher Excavating Inc. in an amount not to exceed $439,176.05 for CP 97-144, subject to approval by the County Attorney’s Office as to form; and

 

BE IT FURTHER RESOLVED, That the Dakota County Board of Commissioners hereby authorizes its Transportation Director to execute a contract with Schumacher Excavating Inc. in an amount not to exceed $262,710.30 for CP 97-164, subject to approval by the County Attorney’s Office as to form; and

 

BE IT FURTHER RESOLVED, That the 2025 Capital Improvement Program budget is hereby amended to include additional funds for County Project 97-144 as follows:

 

                     Expense

                     County Project 97-144                     $ 359,176.05

                     Total Expense                     $ 359,176.05

 

                     Revenue

                     2023 LBRP Funds (SAAS Acct 379) - Construction                     $ 181,812.77

                     Regular Town Bridge Funds (SAAS Acct 76) - Construction                     $   47,363.28

                     Local Town Funds - Construction                     $   10,000.00

                     Special Town Bridge Funds (SAAS Acct 75) - Engineering                     $ 110,000.00

                     Local Town Funds - Engineering                     $   10,000.00

                     Total Revenue                     $ 359,176.05

; and

 

BE IT FURTHER RESOLVED, That the 2025 Capital Improvement Program budget is hereby amended to include additional funds for County Project 97-164 as follows:

 

                     Expense

                     County Project 97-164                     $ 138,710.30

                     Total Expense                     $ 138,710.30

 

                     Revenue

                     Regular Town Bridge Fund (SAAS Acct 76) - Construction                     $ 27,032.72

                     Local Town Funds - Construction                     $ 10,000.00

                     DNR Grant - Construction                     $ 65,677.58

                     Regular Town Bridge Funds (SAAS Acct 76) - Engineering                     $ 26,000.00

                     Local Town Funds - Engineering                     $ 10,000.00 

                     Total Revenue                     $138,710.30

end