Title: Authorization To Execute Joint Powers Agreement With City Of Hastings For Mississippi River Greenway Cost Sharing Of Mississippi Riverbank Repairs
Sponsors: Parks, Facilities, and Fleet Management
Attachments: 1. Project Location Map, 2. Aerial Images, 3. Riverbank Repair Plans

DEPARTMENT: Parks, Facilities, and Fleet Management

FILE TYPE: Consent Action

 

TITLE

title

Authorization To Execute Joint Powers Agreement With City Of Hastings For Mississippi River Greenway Cost Sharing Of Mississippi Riverbank Repairs

end

 

PURPOSE/ACTION REQUESTED

Authorize the execution of a joint powers agreement (JPA) with the City of Hastings for cost sharing of Mississippi Riverbank repairs adjacent to the Mississippi River Greenway (MRG) (Attachment: Project Map).

 

SUMMARY

To provide a safe and efficient greenway system, Dakota County is proceeding with the operations and maintenance of the MRG - Hastings Segments. In 2024, Dakota County identified two segments of trail to be included in the annual overlay package to be reclaimed and repaved within River Flats Park and the earth dam southwest of Lock and Dam Number 2. During preliminary design and analysis, and coordination with the City, severe shoreline erosion adjacent to the trail was identified that has been steadily growing since before 2020 and now encroaching within feet of the trail in 2024 (Attachment: Aerial Images). The reclamation was moved to 2025 to allow for shoreline repairs to occur and avoid paving equipment hazards close to the eroded edge.

 

The City of Hastings contracted with Barr Engineering in 2024 to develop a design for repairing riverbank erosion on the Mississippi River adjacent to the Mississippi River Greenway (Attachment: Riverbank Repair Plans). The slope failure is estimated to cost between $50,000 and $75,000 not including permitting or construction administration to fix. Dakota County will contribute 40 percent of the design and construction costs, and Hastings will contribute the remaining 60 percent and will also lead the construction management and administration.

 

RECOMMENDATION

recommendation

Staff recommends the execution of a joint powers agreement with City of Hastings for necessary riverbank repairs adjacent to the MRG to formalize cost contributions and responsibilities for the construction costs for the period August 19, 2024, to December 31, 2025.

end

 

EXPLANATION OF FISCAL/FTE IMPACTS

Dakota County’s total share of the cost of the JPA is estimated to be between $30,000 and $40,000. Sufficient funding has been authorized in the 2024 Adopted Parks Capital Improvement Program under the Urgent/Unplanned Projects and Parks Asset Preservation Set-Asides.

 

  ☐ None              ☒ Current budget              ☐ Other        

  ☐ Amendment Requested                           ☐ New FTE(s) requested

 

RESOLUTION

body

WHEREAS, the City of Hastings (City) and County staff have identified a riverbank erosion repair needed adjacent to the Mississippi River Greenway; and

 

WHEREAS, the City and County have agreed to partner on this project with the Greenway and adjacent park and riverbank operations and maintenance overlap between agencies; and

 

WHEREAS, the City has completed a riverbank erosion repair engineering plan with Barr Engineering; and

 

WHEREAS, the City will lead the construction project delivery, including management of the consulting engineering firm managing the construction contractor; and

 

WHEREAS, the total estimated cost of construction and design is estimated to be between $75,000 and $100,000; and

 

WHEREAS, the County would contribute up to 40 percent and the City up to 60 percent of total construction costs; and

 

WHEREAS, sufficient revenues are available in the Urgent Improvements Projects and Parks Asset Preservation set-asides in the Adopted 2024 Parks Capital Improvement Program.

 

NOW, THEREFORE, BE IT RESOLVED, That the Dakota County Board of Commissioners hereby authorizes the County Manager, or their designee, to execute a joint powers agreement with the City of Hastings to fund the Mississippi River Greenway riverbank erosion repairs for the period of August 19, 2024, through December 31, 2025, subject to approval by the County Attorney’s Office as to form.

 

end

PREVIOUS BOARD ACTION

18-422; 8/21/18

 

ATTACHMENTS

Attachment: Project Location Map

Attachment: Aerial Images

Attachment: Riverbank Repair Plans

 

BOARD GOALS

   ☒ A Great Place to Live                                          ☒ A Healthy Environment     

   ☐ A Successful Place for Business and Jobs         ☐ Excellence in Public Service

 

CONTACT

Department Head: Niki Geisler

Author: Tony Wotzka