Type: Consent Action Status: Passed
File created: 2/28/2024 In control: Board of Commissioners
On agenda: 3/26/2024 Final action: 3/26/2024
Enactment date: 3/26/2024 Resolution #: 24-172
Title: Authorization To Execute Contract With Oldcastle Infrastructure, Inc. For Box Culvert For Roundabout At Intersection Of County State Aid Highway 46 And County State Aid Highway 85 In Nininger And Vermillion Townships, County Project 46-057
Sponsors: Transportation
Attachments: 1. Project Location Map, 2. Financial Summary

DEPARTMENT: Transportation

FILE TYPE: Consent Action

 

TITLE

title

Authorization To Execute Contract With Oldcastle Infrastructure, Inc. For Box Culvert For Roundabout At Intersection Of County State Aid Highway 46 And County State Aid Highway 85 In Nininger And Vermillion Townships, County Project 46-057

end

 

PURPOSE/ACTION REQUESTED

Authorize the use of budgeted project funds to purchase a concrete box culvert for County Project (CP) 46-057 in Nininger and Vermillion Townships.

 

SUMMARY

To provide a safe and efficient transportation system, Dakota County is proceeding with CP 46-057 (Attachment: Location Map), which consists of installing a roundabout at the intersection of County State Aid Highway (CSAH) 46 (160th Street East) and CSAH 85 (Goodwin Ave). The intersection of CSAH 46 and CSAH 85 exists today as a two-way stop-controlled intersection and has a crash and severity rate that exceeds the typical statewide average. Construction is scheduled for 2024.

 

The project is scheduled to receive bids from construction contractors in May of 2024, with construction beginning in July of 2024. Included in the project is a concrete box culvert for conveying drainage. The lead time on material ordering for concrete box culverts can be 4-6 months and there is a high likelihood that a concrete box culvert needed for the project will not be manufactured in time if ordered with the overall construction contract. To ensure the project can be constructed to completion in the 2024 season, it is necessary for the County to make the purchase of the box culvert in advance the project is awarded.

 

The County has solicited quotes from three regional manufacturers of box culverts:

 

Oldcastle Infrastructure, Inc.                                          $109,463.72

Wieser Concrete Products, Inc.                                          $110,780.00

Rinker Materials                                                                                    $112,434.00

 

The lowest price quoted is provided by Oldcastle Infrastructure, Inc. in the amount of $109,463.72. Staff has reviewed the quotes and determined the quote was competitive.

 

RECOMMENDATION

recommendation

Staff recommends authorization to enter into a contract with Oldcastle Infrastructure, Inc. to manufacture and deliver a box culvert for CP 46-057.

end

 

EXPLANATION OF FISCAL/FTE IMPACTS

The adopted 2024 Transportation Capital Improvement Program Budget includes $2,500,000 for the construction of the project. An additional $19,568.80 is available from previous years’ project design budget. Sufficient funds are available for the purchase of the concrete box culvert, totaling $109,463.72. The purchase costs are 100 percent County costs.

 

  ☐ None              ☒ Current budget              ☐ Other        

  ☐ Amendment Requested                           ☐ New FTE(s) requested

 

RESOLUTION

body

WHEREAS, to provide a safe and efficient transportation system, Dakota County is proceeding with County Project (CP) 46-057; and

 

WHEREAS, CP 46-057 is the preliminary and final design engineering of a roundabout at the intersection of County State Aid Highway (CSAH) 46 (160th Street East) and CSAH 85 (Goodwin Avenue) in Nininger and Vermillion Townships; and

 

WHEREAS, Dakota County is the lead design agency for CP 46-057; and

 

WHEREAS, the advanced purchase of a concrete box culvert is necessary for construction for CP 46-057 to be completed in the fall of 2024; and

 

WHEREAS, the 2024 Transportation Capital Improvement Program (CIP) Adopted Budget includes $2,519,568 for CP 46-057, including carryover dollars; and

 

WHEREAS, the quote of Oldcastle Infrastructure, Inc. in the amount of $109,463.72 was the lowest quote received; and

 

WHEREAS, Dakota County currently has sufficient funds for the costs of the project.

 

NOW, THEREFORE, BE IT RESOLVED, That the Dakota County Board of Commissioners hereby authorizes the Physical Development Director to enter into a contract with Oldcastle Infrastructure, Inc. for County Project 46-057 in the amount of $109,463.72 and all applicable sales taxes based on their product quote.

end

 

PREVIOUS BOARD ACTION

23-510; 11/14/23

 

ATTACHMENTS

Attachment: Project Location Map

Attachment: Financial Summary

 

BOARD GOALS

   ☒ A Great Place to Live                                          ☐ A Healthy Environment     

   ☐ A Successful Place for Business and Jobs         ☐ Excellence in Public Service

 

CONTACT

Department Head: Erin Laberee

Author: Kevin Krech