Legislation Details

File #: DC-5567    Version: 1
Type: Consent Action Status: Agenda Ready
File created: 4/2/2026 In control: Board of Commissioners
On agenda: 5/19/2026 Final action:
Enactment date: Resolution #:
Title: Authorization To Execute Joint Powers Agreement With Vermillion River Watershed Joint Powers Organization, For Ravenna Trail Sontag Ravine Repairs Project, Ravenna Township
Sponsors: Transportation
Attachments: 1. Draft Joint Powers Agreement, 2. Project Map
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
DEPARTMENT: Transportation
FILE TYPE: Consent Action

TITLE
title
Authorization To Execute Joint Powers Agreement With Vermillion River Watershed Joint Powers Organization, For Ravenna Trail Sontag Ravine Repairs Project, Ravenna Township
end

PURPOSE/ACTION REQUESTED
Authorize the execution of a joint powers agreement (JPA) with the Vermillion River Watershed Joint Powers Organization (VRWJPO) for the Ravenna Trail Sontag Ravine Repairs Project, County Project 54-010.

SUMMARY
To promote a safe and efficient transportation system, Dakota County, in cooperation with the VRWJPO, completed erosion stabilization on the Sontag Ravine located on County State Aid Highway (CSAH) 54 (Ravenna Trail) a half mile north of CSAH 68 (200th Street). County Project (CP) 54-010 improved safety and operations of Ravenna trail by eliminating sand and debris from washing over the road and ultimately into the Vermillion River. Construction of the stabilization project was completed in the spring of 2024.

During the summer of 2025, high-intensity rainfall and elevated stream flows undermined the rock structures, displaced the riprap, scoured the channel bed, and accelerated wear at the Ravenna Trail Sontag Ravine beyond what would be expected under normal precipitation and flow conditions. These rainfall events caused damage to the previously constructed stabilization, necessitating repairs.

VRWJPO staff prepared design drawings and specifications to repair the Ravenna Trail Sontag Ravine, which is necessary to maintain compliance with the Grant Agreement (Project). These were approved by the County. Staff conducted a pre-bid meeting and oversaw the advertisement and contracting process. The repairs to the Sontag Ravine project were completed in the late fall of 2025 at a cost of $25,388 and included grading, riprap, and seeding and stabilizing disturbed areas.

A JPA was drafted to allow the definition of the responsibilities of the County and the VRWJPO. Under the terms of the J...